California Borough-Coal Center Pump Station

ADVERTISEMENT FOR BIDS

CALIFORNIA BOROUGH

COAL CENTER PUMP STATION

 

Sealed Bids for the California Pump Station Replacement – Replacement of Coal Center Pump Station will be received, by California Borough, at the California Borough Office, 225 3rd Street, California, PA 15419, until 4:00 P.M. local time on Thursday, March 12, 2026.  Bids received will be publicly opened and read at 6:30 P.M. during their monthly meeting.  The Project consists of removal of old pump station, bypass pumping, constructing new submersible pump station, installing generator at 141 Poplar Drive, Coal Center, PA 15423.

The Pre-Bid meeting (NOT MANDATORY) is scheduled for Wednesday, March 4, 2026 at 3:00 PM at the project location of 141 Poplar Drive, Coal Center, PA 15423.

Questions can be directed to the Project Manager, Steven Eby, at Widmer Engineering Inc by phone at 724-626-1909 ext. 12.

All Bidders must provide evidence of Bid Security with their proposal. Bid Security shall be made payable to the California Borough in an amount of not less than ten percent (10%) of the Bidder’s maximum bid price in the form of either a certified bank check or a Bid Bond, issued by a Surety Company authorized to do business in Pennsylvania. Failure to submit a bid bond or certified bank check will result in the rejection of the bid.

Prevailing Wages will be required.

The Issuing Office for the Bidding Documents is: Widmer Engineering Inc., 225 West Crawford Avenue, Connellsville, PA 15425. Electronic PDF documents are available at no charge. Electronic PDF copies, suitable for printing, of the Contract Documents may be viewed and downloaded at the Widmer Engineering website, https://widmerengineering.com under the “Bids” tab. Hard copies will not be distributed.

Addenda, if any, will be issued to only those persons who are registered as having obtained Contract Documents.

 

Owner: California Borough

By:   Patsy Alfano

Title:  President

Date:     2/20/26

2/27/26

All addenda will be issued to the email addresses below. Delivery confirmation to the email address provided will constitute a receipt of the addenda by the contractor. It is the contractor’s responsibility to check their email addresses at appropriate intervals. Any questions regarding the project must be sent via email to seby@widmerengineering.com.  All questions and answers will be posted to the bid advertisement page.  Questions will not be answered via phone calls during bid stage. Upon completion of each field, double check your information then click “SUBMIT” and you will be directed to the download page. Incorrect or incomplete information could disqualify your bid.

Download the bid package in PDF format for:  California Borough-Coal Center Pump Station