Replacement Of Beaver Co. Bridge 24 On Brickyard Road Over Brady’s Run

Pre-Existing Bridge – November 2014

The project consists of the replacement of a concrete T-beam bridge with a spread concrete box beam bridge on Brickyard Road (Borough Road) over Brady’s Run. The bridge is in need of repair and cannot be weight or lane restricted due to the heavy industrial access. Consequently, the existing bridge must remain open while a new bridge is constructed approximately 50 feet upstream from the existing bridge.

Brickyard Bridge Replacement – July 24, 2020

Brickyard Bridge Overview - July 10, 2020