The project consists of the replacement of a concrete T-beam bridge with a spread concrete box beam bridge on Brickyard Road (Borough Road) over Brady’s Run. The bridge is in need of repair and cannot be weight or lane restricted due to the heavy industrial access. Consequently, the existing bridge must remain open while a new bridge is constructed approximately 50 feet upstream from the existing bridge.